Section 4.5.3: Exercise: Modelling the vaporiser with a control syste
The vaporiser model has no control system and will
eventually either boil dry or go off the boil.
- First add a proportional controller to regulate the
holdup in the boiler (i.e. the level) at a setpoint of 0.8
kmol.
- Then add a proportional controller to regulate the pressure at
1.5 bara.
- Finally make the pressure a controller a PI controller.
Produce graphs of the level and pressure against time.
Email the worksheet with graphs to us as an attachment.